Please use this identifier to cite or link to this item: http://hdl.handle.net/123456789/5161
DC FieldValueLanguage
dc.contributor.authorMohd Hanizun Hanafien_US
dc.contributor.authorShardy Abdullahen_US
dc.contributor.authorRamly Hasanen_US
dc.contributor.authorHakimi Ahmaden_US
dc.contributor.authorAnita Rauzanaen_US
dc.date.accessioned2023-11-21T02:16:56Z-
dc.date.available2023-11-21T02:16:56Z-
dc.date.issued2023-
dc.identifier.issn2600-7533-
dc.identifier.urihttp://hdl.handle.net/123456789/5161-
dc.descriptionMyciteen_US
dc.description.abstractOne of the most important elements in carrying out construction activities is the maintenance of the status of availability of construction materials at the construction site. If it fails to be prepared and maintained, the workers will not be able to perform their tasks. In fact, the motivation to perform a task will be lost and it will take a long time to return. Therefore, the objective of this paper is to identify the critical success factors of material availability at the construction site. A qualitative study in the form of interviews was conducted to thirty-eight construction contractors, including fifteen suppliers who met the selection criteria of this study. The results of the study revealed six critical success factors of material availability on the construction site. These factors include the contractor's current financial status; relationship (tolerance) between contractor and supplier; work planning and scheduling; good communication between main contractors and sub-contractors, and suppliers; availability of building materials in supplier's storage; and the availability of machines, machinery and trucks. All these critical success factors that have been obtained support the findings of previous studies in the context of the availability of materials at the construction site.en_US
dc.publisherUniversity Malayaen_US
dc.relation.ispartofJournal Of Project Management Practice (JPMP)en_US
dc.subjectcritical success factorsen_US
dc.subjectmaterial availabilityen_US
dc.subjectconstruction sitesen_US
dc.subjectqualitative methodsen_US
dc.titleCritical Success Factors of building materials availability at construction sites using a qualitative approachen_US
dc.typeNationalen_US
dc.description.page23-43en_US
dc.volume3(1)en_US
dc.description.typeArticleen_US
dc.contributor.correspondingauthorhanizun.h@umk.edu.myen_US
item.openairetypeNational-
item.grantfulltextopen-
item.fulltextWith Fulltext-
crisitem.author.deptUniversiti Malaysia Kelantan-
crisitem.author.orcid0000-0002-3856-2864-
Appears in Collections:Faculty of Architecture and Ekistics - Proceedings
Show simple item record

Google ScholarTM

Check


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.